Installation of (4) 30,000-gallon aboveground storage tanks to serve (4) four 2000 kW generators and (4) four Boilers. Installation of (2) fuel oil pump skids to serve the four generators along with (2) fuel oil pump skids to serve the boilers. We also installed (2) fuel oil filtration systems to cycle and scrub the fuel in the ASTs once a month.

Memorial Hermann

Installation of (2) 40,000-gallon UST with underground piping piped to the fuel oil pump room. Installation of 3 duplex fuel oil pump sets motor control and logic panels. installed aboveground double wall piping to third story of the generator rooms where we installed three logic panels in three rooms to serve (6) 2000 kW generators.

City of Houston
South Post Oak

Removal of (4) existing 20,000-gallon USTs along with underground piping and dispensers. Installation of (4) 25,000-gallon USTs along with new tank top equipment and underground double wall piping to new dispensers. Installed all new electrical along with new fuel monitoring and fuel management systems.

City of Houston
Judiway St.

Removal of  (3) USTs along with underground piping and dispensers. Installed new USTs along with underground double wall piping new electrical, fuel monitoring and fuel management systems.

City of Houston
Burress St.

Installation of (3) new USTs along with underground double wall piping, electrical. Installation of new fuel island canopy along with new dispensers, fuel management system, fuel monitoring system, DEF system. Installation of fuel control room for all power and communications.

City of Sugarland

Installation of new AST foundation pad and AST. Installation of new underground double wall piping to existing canopy and connected to existing diesel dispenser. Once new system was installed and functioning, we removed the existing diesel UST and piping and poured back concrete.

Waller ISD

Installation of (4) AST with new tank top equipment. Installed new off-loading pumps to fill the new ASTs. We install new fuel oil steel piping in a concrete trench to (6) dispensers (4) diesel and (2) unleaded. We installed new fuel monitoring system and a new fuel management system.